国产一区免费播放_国产日韩经典三级在线观看_免费一级欧美大片在线观看_内射交换多P国产_久久人妻无码一区_91天堂极品嫩模在线_野花视频播放免费观看最新6_男按摩技师h文高辣_长篇女教师的荡欲小说_亚洲av秘 无码一区在线播放

催化裂化裝置

News

Product

contact us

Yingkou Qingying Petrochemical Equipment Co., Ltd

Marketing department: manager Guo

Mobile: 18641771136

Purchasing department: Manager Zhu

Mobile: 13050617889

Address: No. 58, South Binhai Road, Xishi District, Yingkou, Liaoning, China

How to prevent accidents in heavy oil catalytic cracking unit pressure vessel?

Your current location: Home >> News >> Industry news

How to prevent accidents in heavy oil catalytic cracking unit pressure vessel?

Date:2020-07-15 Author: Click:

The pressure vessel factory is used for industrial production. There is a lot of pressure inside the pressure vessel. The heavy oil catalytic cracking device must prevent accidents during use. Let's take a look at how to prevent it.


1. In the design, a reasonable structure should be adopted, such as a full penetration structure, which can expand freely, etc., to avoid stress concentration and geometric mutation; according to the working conditions of the equipment, materials with better plasticity and toughness should be selected; strength calculation and safety Valve displacement calculations are standard.


2. When manufacturing, repairing, installing, and transforming, strengthen welding management, improve welding quality, and conduct heat treatment and flaw detection according to specifications; strengthen material management, and avoid using defective materials or using wrong steel and welding materials.

重油催化裂化裝置

  

3. During the use of the boiler, strengthen the operation management of the boiler to ensure that the safety accessories and protection devices are flexible and complete: strengthen the water quality management, prevent corrosion, scaling, and the relative alkalinity is too high; improve the quality of the boiler workers, prevent water shortage, Misjudgment, misoperation, etc.


4. In the use of liquefied gas tankers, strengthen the use management to avoid operation errors, over-temperature, over-pressure, over-load operation, loss of inspection, disrepair, failure of safety devices, etc.


5. Strengthen inspection work, find defects in time and take effective measures.

Tags:

Browse:

Products:

News: